Your Own Crew Is Remodeling the Shop: What OSHA 1910.304(b)(3)(ii) Requires of GFCI Protection on Temporary Power
OSHA 1910.304(b)(3)(ii) requires GFCI protection on temporary power during maintenance, remodeling and repair. What it means when your own staff do the work.
It is the slow week before the holidays, and you have decided this is the moment to finally take down the wall between the back office and the parts room. You are not hiring a contractor. Two of your own people are doing it: one with a reciprocating saw, one with a shop vac and a drill, both running off a fifty-foot cord that snakes from an outlet in the break room, across a floor that is about to be covered in drywall dust and, by Thursday, the water from the mop bucket. Nobody on your payroll calls themselves a construction worker. Nobody thinks of this as a construction site.
OSHA does, at least for the purpose of one paragraph. This post answers a narrow question: when your own employees do maintenance, remodeling or repair work in a general industry workplace and run tools off temporary power, what does 29 CFR 1910.304(b)(3)(ii) require of ground-fault protection? The short answer is that every 125-volt, single-phase, 15-, 20- and 30-amp receptacle outlet they are using that is not part of the building's permanent wiring must be GFCI-protected, and an extension cord's connector counts as one of those outlets. If you are a contractor working on someone else's job, the construction rule is a different paragraph, covered in our post on the assured equipment grounding conductor program under 1926.404.
What 1910.304(b)(3)(ii) actually says
Section 1910.304 is the wiring design and protection standard in Subpart S, OSHA's general industry electrical rules. Paragraph (b)(3), "Ground-fault circuit interrupter protection for personnel," has two parts. The first, (b)(3)(i), requires GFCI protection on all 125-volt, single-phase, 15- and 20-amp receptacles installed in bathrooms or on rooftops, permanently.
The second part, (b)(3)(ii), is the one this post is about. It opens by saying its requirements "apply to temporary wiring installations that are used during construction-like activities, including certain maintenance, remodeling, or repair activities, involving buildings, structures or equipment." Then (b)(3)(ii)(A) sets the core rule: all 125-volt, single-phase, 15-, 20-, and 30-ampere receptacle outlets "that are not part of the permanent wiring of the building or structure and that are in use by personnel" must have GFCI protection for personnel.
Two notes printed directly under that paragraph do most of the practical work. Note 1 says that "a cord connector on an extension cord set is considered to be a receptacle outlet if the cord set is used for temporary electric power." Note 2 says that "cord sets and devices incorporating the required ground-fault circuit-interrupter that are connected to the receptacle closest to the source of power are acceptable forms of protection."
Put those together and the shape of the rule is clear. The wall outlet in your break room is permanent wiring. The moment your crew plugs a cord into it to power tools for a remodel, the far end of that cord is a temporary receptacle outlet in use by personnel, and it needs GFCI protection. You can meet that with a GFCI breaker or GFCI receptacle at the source, or with a GFCI-equipped cord set or plug-in adapter at the outlet closest to the power source.
When your shop work becomes "construction-like"
The phrase that trips people up is "construction-like activities." The standard does not define a threshold, and it does not say that every task involving a drill is covered. What it does say is that the paragraph applies to temporary wiring used during maintenance, remodeling or repair of buildings, structures or equipment that resembles construction work.
In a small business, the cases that plainly fit are the ones that look like a job site: tearing out or building walls, replacing flooring, re-roofing, running new conduit, rebuilding a loading dock, or tearing down and reinstalling a large piece of equipment with power tools fed by cords strung for the occasion. The common thread is that the power arrangement exists for the project and will be pulled up when the project ends.
The cases that do not obviously fit are routine operations: the bench grinder that is hard-wired at its station, the floor scrubber that is charged every night from the same outlet, the drill a technician uses on a customer's vehicle as part of the ordinary work of the shop. Those are governed by other parts of Subpart S, including the cord and equipment rules, but they are not the temporary-wiring scenario (b)(3)(ii) is aimed at.
Between the clear cases there is a band where reasonable people could argue, and the argument is rarely worth having. A GFCI cord set plugs in at the wall and settles the question for every tool downstream of it. If your crew is doing anything you would describe as "a project" rather than "the job," treat it as covered.
Why water and dust make this a winter problem
GFCI protection exists because the most dangerous electrical faults on temporary setups are the ones a circuit breaker will not catch. A breaker trips when current is far above what the circuit is rated for. A person becoming the path to ground can carry a current far too small to trip a breaker and still be enough to injure or kill. A GFCI device watches for an imbalance between the current going out and the current coming back, and it opens the circuit very quickly when some of that current is leaking somewhere it should not, including through a person.
The conditions that cause that kind of leakage are exactly the conditions of a remodel: cords run across floors where they get stepped on, rolled over and pinched in doorways; tools with damaged housings; drywall dust and sawdust packed into connectors; and, in winter, meltwater tracked in on boots, wet mops, and the condensation that forms when a cold space is suddenly heated. A cord connector sitting in a puddle at the edge of a demolition area is the scenario Note 1 was written for.
That is also why where you put the protection matters. A GFCI at the outlet closest to the source protects the whole cord and everything plugged into it. A GFCI adapter plugged into the far end of a long run protects the tool, but leaves the length of cord between the wall and the adapter unprotected, which is the part most likely to be run over or soaked. Note 2 names the receptacle closest to the source for a reason.
No assured grounding option for ordinary cords
Small business owners who have worked in construction, or who have hired contractors, sometimes assume they can choose between GFCIs and an assured equipment grounding conductor program, the inspect-and-test system with color-coded tape and a written procedure. On a construction site under 1926.404(b)(1), that is a choice the employer has.
In general industry under 1910.304(b)(3)(ii), it is not a choice for the outlets most shops use. Paragraph (A) requires GFCI protection for 125-volt, single-phase, 15-, 20- and 30-amp temporary receptacles, full stop. The assured grounding program appears in (b)(3)(ii)(C), and it only comes into play for receptacles other than those, the larger or higher-voltage temporary receptacles covered by (b)(3)(ii)(B), and only "where the ground-fault circuit-interrupter protection required by paragraph (b)(3)(ii)(B) of this section is not available."
If you do end up there, for example with a 240-volt temporary feed for a welder or a heater during a renovation, the program is not a formality. Paragraph (C) requires a written description of the program available at the jobsite, one or more designated competent persons, a visual inspection of each cord set and cord-connected tool before each day's use, continuity and terminal-attachment tests before first use, after repairs, after any incident reasonably suspected to have caused damage and at intervals not exceeding three months, and a record of those tests kept by logs, color coding or another effective means.
Setting up the job before the first cut
Turning this into practice before the project starts takes less effort than the rule's length suggests. Before anyone plugs in, decide where temporary power will come from and put the GFCI protection there: a GFCI receptacle or breaker on that circuit, or a GFCI cord set or adapter at the wall outlet. If your outlets are already GFCI-protected, confirm it by pressing the test button and checking that power at the cord's end actually drops, then reset it. The manufacturer's instructions on the device say how it is meant to be tested.
Then look at the cords themselves. GFCI protection is not a substitute for the separate requirement in 1910.334(a)(2) that portable cord- and plug-connected equipment, including extension cords, be visually inspected before use on any shift for external defects and signs of internal damage. A GFCI may trip on a damaged cord, but it will not stop someone from handling a cord with exposed conductors. Our extension cord and portable tool inspection checklist walks the same pre-use points 1910.334(a)(2) expects and is a practical sheet to hand the crew on day one.
Finally, plan for the trip. A GFCI that keeps tripping is telling you something: a wet connector, a damaged cord or a tool with a fault. The wrong response is to move the cord to an unprotected outlet so the work can keep going. Tell your crew in advance that a nuisance trip means stop, look and replace, and give them somewhere to get a dry, undamaged cord without hunting for one.
What this rule does not cover
This post covers one paragraph. Following it does not make your electrical setup compliant on its own. Subpart S also covers flexible cord uses and limits in 1910.305(g), which is why a cord that stays in place after the remodel is finished becomes a different problem, discussed in our post on extension cords that turn into permanent wiring. It covers safe work practices around energized parts in 1910.333, and the lockout rules in 1910.147 still apply when your crew is working on equipment rather than off a cord. And if the work involves the building's own wiring, such as moving outlets or adding circuits, that is work for a qualified electrician, not for the people holding the saw.
What 1910.304(b)(3)(ii) does is close a gap small businesses fall into because they do not think of themselves as builders. The week your own staff start a project, the cord across the floor is temporary wiring, its end is a receptacle outlet, and it needs a GFCI between it and the wall.
Related reading: The Extension Cord Nobody Tested: Assured Equipment Grounding on Small Construction Sites | Extension Cords Are Not Wiring | The Frayed Cord in the Drawer: What 1910.334 Requires Before Every Shift | Electrical Hazards Small Businesses Miss
OSHA standards cited
- 29 CFR 1910.304
General Industry Standards
- 29 CFR 1926.404
Construction Industry Standards
- 29 CFR 1910.334
General Industry Standards
- 29 CFR 1910.305
General Industry Standards
- 29 CFR 1910.333
General Industry Standards
- 29 CFR 1910.147
General Industry Standards
Always verify current OSHA standards at osha.gov. This article reflects standards in effect at the date of publication.
Not sure where you stand?
Take the 5-minute compliance assessment. Answer a few questions about your business and get a prioritized list of what OSHA expects, free.
Related Articles
Continue learning about OSHA compliance and workplace safety
Electrical Safety
Dark by Four O'Clock: What OSHA 1926.405(a)(2) Requires of the Temporary Lights on Your Jobsite
29 CFR 1926.405(a)(2) sets the rules for temporary jobsite lighting: guarded lamps, no hanging by the cord, hard-usage cords and wet-location limits on site.
Electrical Safety
The Breaker Labeled 'Misc': What OSHA 1910.303(f) Requires of Your Panel Directory
OSHA 1910.303(f) requires each circuit to be legibly marked at its breaker or disconnect. What that means for a small shop's panel directory and motor switches.
Electrical Safety
Can Your Electrician Just Work the Panel Live? What OSHA 1910.333 Says About Deenergizing First
OSHA 1910.333(a) says live parts must be deenergized before anyone works on or near them. See the narrow exceptions and what to do before a panel opens.