OSHA 29 CFR 1926 Subpart P, Appendix A requires a competent person to classify soil with a visual and a manual test. Here is how that works on a real jobsite.

Updated October 21, 2026
7 min read
By the WorkSafely safety team

The crew pulled up at seven, the utility locate marks were already painted on the grass, and the excavator operator had a trench started before the foreman finished his coffee. By the time the trench was four feet deep, the owner was standing at the edge asking the question every small contractor eventually asks: do we need a box in this, or can we just slope it back and keep going? The honest answer depends on something nobody in the truck had checked yet. It depends on what the dirt is.

Soil classification is the step in trench work that gets skipped most easily, because it produces no equipment and no paperwork anyone can see from the road. But the entire protective system decision rests on it. Under 29 CFR 1926.652, a trench five feet or deeper needs a protective system unless it is cut entirely in stable rock, and the rules for what that system can look like change with the soil. Get the classification wrong and every choice downstream, from slope angle to the shield you rent, is built on a guess.

Who Is Allowed to Make the Call

The classification is not the excavator operator's judgment, and it is not the owner's. Appendix A to Subpart P of Part 1926 says each soil and rock deposit must be classified by a competent person. OSHA's definition of a competent person in 1926.650 is someone who is capable of identifying existing and predictable hazards in the surroundings or working conditions that are unsanitary, hazardous, or dangerous to employees, and who has authority to take prompt corrective measures to eliminate them. For a trench, that means a person who actually understands soil behavior and who can stop the job.

For a small contractor, this is usually the foreman or the owner. The practical point is that the person must be named before the day starts, must be on site while the excavation is open, and must have enough training to run the tests described below. Standing near the trench with a clipboard does not satisfy the standard. Making and recording a real determination does.

What the Appendix Actually Asks For

Appendix A is more specific than most people expect. It requires that classification be based on the properties, performance, and characteristics of the soil, and that the competent person perform at least one visual analysis and at least one manual analysis. One test is not enough, and two tests of the same kind do not count. The visual test and the manual test are meant to cross-check each other, because soil that looks stable can behave very differently once you press on it.

The visual part is done standing at the edge and looking at the spoil pile and the trench walls. The competent person is looking at particle size, whether the soil is granular or cohesive, whether the walls show cracks or fissures, whether there is water seeping in, and whether the ground has been disturbed before. A trench that cuts through the line of an old utility, for example, is in previously disturbed soil, and the appendix is clear that previously disturbed soil cannot be Type A.

The manual tests are simple enough to run with a few minutes and a small sample. Appendix A describes a plasticity test, where moist soil is rolled into a thread about one-eighth inch in diameter and at least two inches long and held by one end to see whether it supports its own weight. It describes a dry strength test, where a dry clump is crumbled to see whether it breaks into fine powder or stays in hard lumps. It describes a thumb penetration test, which is a rough way to estimate how much force it takes to indent the soil. And it describes pocket penetrometers and shear vanes, which are inexpensive instruments that put a number on the soil's unconfined compressive strength. A small contractor who digs regularly will find a pocket penetrometer one of the best-value tools on the truck, though the appendix treats it as one acceptable method rather than a requirement.

What Separates the Three Types

The classifications run from most stable to least. Type A soils are cohesive with an unconfined compressive strength of 1.5 tons per square foot or greater. Hard clay is the usual example. Type B soils fall above 0.5 and below 1.5 tons per square foot, and the appendix also places granular cohesionless soils such as angular gravel there, along with some previously disturbed soils. Type C soils have an unconfined compressive strength of 0.5 tons per square foot or less, and they include granular soils such as sand and loamy sand, submerged soil, and soil from which water is freely seeping.

The part that catches people is how many conditions knock a soil out of Type A even when it feels hard. The appendix says soil cannot be Type A if it is fissured, if it is subject to vibration from heavy traffic, pile driving or similar effects, if it has been previously disturbed, or if it is part of a sloped, layered system where the layers dip into the excavation on a slope of four horizontal to one vertical or steeper. A trench beside a road with trucks rolling past, in clay that looks like concrete, is not Type A. When a deposit has features of more than one type, the safer practice is to classify to the less stable one.

Layered ground gets its own rule. A trench that passes through several layers is generally classified by its weakest layer, though the appendix allows each layer to be classified separately where a more stable layer lies beneath a less stable one. A sandy seam under a stiff clay cap is a classic trap, because the cap makes the whole wall look solid.

Why the Type Drives Everything Else

Once the soil is classified, the options in 1926.652 open up or narrow down. For sloping, Appendix B lists maximum allowable slopes: three-quarters horizontal to one vertical for Type A, one to one for Type B, and one and a half to one for Type C. A contractor can also use a simple slope of one and a half to one in any soil for trenches up to twenty feet deep, which avoids classification for sloping but takes up a lot of room. Benching, shoring, and shielding each carry their own limits tied to soil type, and manufacturer tabulated data for trench boxes is written against these same classifications. A box rated for Type C conditions on its data plate is a different purchase decision than one you only need in Type A.

Excavations deeper than twenty feet require a protective system designed by a registered professional engineer. That is a line small contractors should treat as a signal to call someone, not to improvise.

Classification Is Not a One-Time Event

The appendix requires reevaluation when conditions change. Rain, a dewatering failure, a nearby compactor, or a sunny day that dries the surface can all move soil from one category to another, and the competent person needs to look again. This ties directly to the daily inspection requirement in 1926.651(k), which has the competent person inspect the excavation, the adjacent areas, and the protective systems before work starts each shift, and again as needed during the shift, including after a rainstorm or any event that could increase hazards. Water that accumulates in the excavation is its own problem, and 1926.651(h) restricts employee exposure to it unless adequate precautions have been taken.

Keeping a short written record of what was tested, what was found, and what system was chosen is not specifically demanded in every circumstance, but it is the easiest way to show an inspector, an insurer, or your own foreman a month later that the decision was made deliberately. A single page per trench, with the date, the tests run, the soil type assigned, and the protective system used, takes minutes to complete.

A Practical Morning Routine

On the next job, make soil classification the first thing that happens after the utilities are located and before the excavator touches the ground. Have the competent person pull a sample from the spoil, run a visual check and at least one manual test, write down the result, and look at the surroundings for vibration sources and old disturbance. Choose the protective system from that result, keep the spoil pile at least two feet back from the edge as 1926.651(j)(2) requires, and make sure a ladder or other means of egress is within twenty-five feet of workers in any trench four feet deep or more. Then recheck whenever the weather or the ground changes.

None of this guarantees a trench will hold, and none of it substitutes for an engineer's design where the standard calls for one. What it does is replace a coin flip with a decision. When the owner at the edge of the trench asks whether to box it or slope it, the person with the penetrometer and the notebook can answer with something better than a feeling.

Related reading: Asbestos in Renovation Work: What Small Contractors Must Know Before They Start Demolition | Trenching and Excavation Safety: What Every Small Contractor Needs to Know Before Digging Season | Temporary Stairways on a Small Job Site: What OSHA 1926.1052 Requires Before Anyone Carries Material Up Them

OSHA standards cited

Always verify current OSHA standards at osha.gov. This article reflects standards in effect at the date of publication.

Not sure where you stand?

Take the 5-minute compliance assessment. Answer a few questions about your business and get a prioritized list of what OSHA expects, free.

Start free assessment