Scrap Lumber, Nails and Rags: What OSHA 1926.25 Actually Requires of Your Jobsite Housekeeping

OSHA 1926.25 sets construction housekeeping rules for scrap lumber, nails, combustible debris and oily rags. See what small contractors must do on every jobsite.

Updated October 28, 2026
6 min read
By the WorkSafely safety team

The framing crew finishes the second-floor deck on a Thursday afternoon and leaves for the weekend. What they leave behind is ordinary: cut-offs from the plates, a few pieces of form lumber with the nails still sticking out, a pile of drywall packaging by the stairwell, and a coffee can of rags that were used to wipe down a solvent-based sealer. Nobody did anything wrong in the way a person usually thinks of it. But on Monday morning another trade walks that floor in the dark, and a short, plain rule in the construction standards is already being broken.

That rule is 29 CFR 1926.25, titled Housekeeping. It is only three short paragraphs, and it is easy to overlook next to the headline standards on falls and trenches. This post goes through what each paragraph says, how inspectors and crews tend to run into it, and what a small contractor with no safety staff can do about it without adding a full-time job. If your question is about the general-industry rules for floors and aisles in a shop or warehouse, that is a different standard and a different post; this one is about the jobsite.

Paragraph (a): lumber with nails, and everything else, cleared from where people walk

The first paragraph says that during construction, alteration, or repairs, form and scrap lumber with protruding nails, and all other debris, must be kept cleared from work areas, passageways, and stairs, in and around buildings or other structures.

Read it slowly, because the wording is more specific than it first looks. It names scrap lumber with protruding nails because that is the classic jobsite injury hazard: a board on the ground with a nail pointing up, or one left leaning where someone brushes against it. But it then extends to "all other debris," which is deliberately broad. Offcuts, wire, strapping, packaging, spilled fasteners, pieces of conduit and the cord from last week's temporary lighting all count if they are in a place people need to walk or work.

Notice also the three places named: work areas, passageways, and stairs. The standard is not asking for a spotless site. It is asking that the places where people actually move and work are kept clear. A pile of cut-offs stacked deliberately at the edge of a slab is a different situation from the same pile scattered across the route to the stair. Crews who understand that distinction tend to manage housekeeping well, because they stop thinking of it as "cleaning up" and start thinking of it as keeping routes open.

Stairs deserve special mention. Debris on a stairway is a trip hazard, and it can also hide the very edge you are stepping toward. If a stair is being used as the route between floors, it needs to be treated as a passageway, not as the most convenient place to set down a load of scrap. The temporary stair rules in Subpart X are a separate subject, covered in our post on temporary stairways on construction sites.

Paragraph (b): combustible scrap leaves the site on a schedule

The second paragraph deals with fire rather than tripping. It says combustible scrap and debris must be removed at regular intervals during the course of construction, and that safe means must be provided to facilitate that removal.

Two phrases carry the weight here. The first is "regular intervals." The standard does not say daily, weekly, or at the end of each phase. It leaves the interval to the employer, which is both a flexibility and a trap. A contractor who removes debris only when the pile becomes inconvenient has not set an interval; they have waited for a problem. The practical way to meet the paragraph is to decide on an interval that fits the job, write it into the plan for the site, and give someone the specific task.

The second phrase is "safe means shall be provided to facilitate such removal." This is easy to miss and is often the real gap on small jobs. If debris from an upper floor is being thrown over the side, or carried down an unfinished stair by hand because there is no chute, no hoist and no designated container, the removal itself is creating hazards. The standard puts the burden on the employer to provide a safe way to get the material out. On a low-rise build that might be a designated drop zone with a container below it and a way of keeping people out from underneath. On a renovation inside an occupied building it might be a cart and a route. What matters is that the method exists before the debris does.

Combustible debris matters most where there is ignition potential on the same site: cutting and welding, temporary heaters, electrical work, or a smoker's habit that nobody has stopped. If your crews do hot work, the housekeeping around it is not separate from your fire controls. It is one of them. Our post on fire extinguishers and the fire protection program on construction sites covers the companion requirements.

Paragraph (c): containers, covers, and the oily rag problem

The third paragraph is about waste containers. It requires containers for the collection and separation of waste, trash, oily and used rags, and other refuse. It then adds that containers used for garbage and other oily, flammable, or hazardous wastes, such as caustics, acids, and harmful dusts, must be equipped with covers. Finally, it says garbage and other waste must be disposed of at frequent and regular intervals.

Three separate duties sit in that paragraph. First, you need containers at all, meaning something provided for the purpose rather than a corner of the floor. Second, the containers should support separation, which is why a single open bin for everything is hard to defend, particularly when one of the things going in is oily rags. Third, anything that holds oily, flammable, or hazardous waste has to have a cover.

The reason for the cover is not complicated. Rags soaked in certain products can heat up and ignite on their own, and an open container gives that process air, fuel and visibility to a stray spark. A covered metal container for oily rags is cheap, and it is one of the least expensive fire controls on a jobsite. Read the labels and safety data sheets for the finishes, sealers and solvents you use, because those documents will tell you what the product is and what it can do. The rule on covered containers does not depend on you having had a fire before.

Do not skip the phrase "frequent and regular intervals" at the end. A covered container that is never emptied has simply become a stored hazard.

Who is responsible when several trades share the site

On a small contractor's own job, the answer is straightforward: the employer in charge of the work area has to manage it. The harder situation is the shared site. A framing sub leaves debris, an electrician walks through it, and the general contractor is the one an inspector meets first. OSHA's multi-employer citation policy can reach more than one employer for the same condition, depending on who created it, who was exposed, and who had control of the site. You do not need to memorize the policy to act on the simple lesson: agree who clears what before the work starts.

The cleanest way to do that is to put it in the subcontract or the kickoff conversation, in plain words. Each trade removes its own scrap daily or at the end of each work period, and the general contractor provides the containers, the removal route and the pickup schedule. That arrangement is not required by 1926.25 in so many words, but it makes the standard's three paragraphs achievable for everyone, and it gives you something concrete to point to if a subcontractor falls behind.

A practical housekeeping routine for a small crew

Because the standard is short, the compliance work is mostly habit. A routine that fits a small outfit usually has four parts. At the start of each shift, whoever is leading the crew walks the work areas, passageways and stairs and clears anything that would trip, puncture or block. During the shift, offcuts and packaging go into containers as they are generated, not afterward. At the end of the shift, the oily-rag container is covered, scrap lumber is either denailed or stacked out of the way, and the debris pile has a scheduled way out. Once a week or once a phase, someone looks at whether the removal method still works as the building changes, because a chute that worked on the first floor may not work on the fourth.

Write that routine down in a few lines and keep it with your other site paperwork. If you have a written safety plan, this belongs in it. If you do not, a one-page note that names the person responsible and the removal method is better than nothing.

None of this is exotic, and that is the point. Housekeeping is where a jobsite shows whether anyone is paying attention, because it is visible to every worker and every visitor. A site that is kept clear also tends to be a site where other hazards are noticed sooner.

This post describes the requirements of one standard in general terms and is not legal advice. Read the current text of 29 CFR 1926.25 and any applicable state plan requirements, and talk to a qualified professional about your specific site.

Related reading: Temporary Stairways on Construction Sites | Construction Site Fire Extinguishers and the Fire Protection Program | Struck-By Hazards: Prevention for Small Businesses

OSHA standards cited

Always verify current OSHA standards at osha.gov. This article reflects standards in effect at the date of publication.